Interstate I-5 Traffic & Road Conditions in Oregon

Oregon DOT Traffic Cameras

TripCheck Oregon Incidents (14)

I-5

North

Slow Traffic - Estimated delay under 20 minutes

PACIFIC
I-5, 5 miles North of Albany
Slow traffic. Prepare to slow.
I-5

North

Slow Traffic - Estimated delay under 20 minutes

PACIFIC
I-5, 9 miles South of Albany
Slow traffic. Prepare to slow.
I-5

North

Rest area - Closure

PACIFIC
I-5, 11 miles North of Intersection with Beltline Highway
The rest area is closed at this time.
I-5

North

Road Construction - No to Minimum Delay

PACIFIC
I-5, Intersection with Elkton - Sutherlin Highway ORE138
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
I-5

South

Road Construction - Estimated delay under 20 minutes

PACIFIC
I-5, 1 mile North of Portland, Intersection with SW Capitol Highway
SW 26th Avenue under I-5 is open. Nighttime single lane closures on I-5.
I-5

South

Road Construction - Estimated delay under 20 minutes

PACIFIC
I-5, Intersection with Willamette Highway ORE58
Road construction is occurring. Prepare to slow. Watch for workers. Ramps Affected.
Work is occurring Sunday-Thursday nights 7pm-6am. Reduced speed limit of 55 MPH in the work zones. Expect southbound outside lane closure and occasional ramp closures. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21540)
I-5

North

Road Construction - No to Minimum Delay

PACIFIC
I-5, 9 miles North of Intersection with Beltline Highway
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Workers will begin paving northbound I-5 the night of June 2. Lane closures will occur between 8:00 PM and 5:30 AM. A work zone speed reduction of 55 MPH will be enforced. Please drive carefully and lookout for workers in the roadway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22508)
I-5

North

Road Construction - Estimated delay under 20 minutes

PACIFIC
I-5, Roseburg
Road construction is occurring. Prepare to slow. Watch for workers. Ramps Affected.
I-5

North

Road Construction - Estimated delay under 20 minutes

PACIFIC
I-5, 5 miles South of Medford
Road construction is occurring. Prepare to slow. Watch for workers.
I-5

North

Road Construction - Estimated delay under 20 minutes

PACIFIC
I-5, 5 miles North of Woodburn
Road construction is occurring. Prepare to slow. Watch for workers.
Crews working nightly, Sunday through Thursday with occasional weekend work. Up to two lanes closed nightly in either direction on I-5 from 8 p.m. to 8 a.m. Other roads in the project area to have single lane closures as needed from 9 p.m. to 6 a.m. Reduced speed to 55 mph in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22505)

Road Construction - Estimated delay under 20 minutes

HISTORIC COLUMBIA RIVER
HWY100, 5 miles West of Ainsworth State Park
No traffic impacts. The new traffic signal is on.
Project description: Two 100 year-old elevated roadways that provide access to Multnomah Falls require repairs to continue providing access to one of Oregon's most iconic sites. The elevated roadways – called viaducts – carry vehicles and bicycles to the Falls and Lodge from the Historic Columbia River Highway. The west viaduct will be closed fall 2024 through spring 2025. The east viaduct will be closed fall 2025 through spring 2026. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
I-5

South

Road Maintenance Operations - No to Minimum Delay

PACIFIC
I-5, Intersection with Pacific Highway ORE99
Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
I-5

North

Bridge Work - Estimated delay under 20 minutes

PACIFIC
I-5, 7 miles North of Albany
Bridge work is occurring. Prepare to slow.
Crews working Sunday night through Friday morning, 9 p.m. to 5 a.m. Single lane closures. reduced speed of 55 MPH through the work zone.

Bridge Work - Estimated delay under 20 minutes

MCMINNVILLE SPUR
Bridge work is occurring. Prepare to slow.
Bridge work continues. Use caution. Expect traffic delays of up to 20 minutes several through early 2024. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19389)

I-5 Major Junctions (15)

View incidents along related routes

No active ODOT Message Signs found.