Highway US-26 Traffic & Road Conditions in Oregon

Oregon DOT Traffic Cameras

TripCheck Oregon Incidents (20)

US-26

Wildfire - No to Minimum Delay

JOHN DAY
US26, 9 miles South of Ironside
A wildfire in the area. Use caution.
US-26

Animal Struck - Hazard - No to Minimum Delay

OCHOCO
US26, 13 miles East of Prineville
An animal has been struck and is creating a hazard. There should be no to minimum delay to traffic. Use caution.
US-26

Rock fall - Unconfirmed

OCHOCO
US26, 1 mile East of Mitchell
An unconfirmed report of falling rocks has been received. Use caution.
US-26

East

- No to Minimum Delay

SUNSET
US26, 2 miles West of North Plains
Utility work is causing minimal delay to traffic. Use caution.
Currently work is scheduled from 5/29/2024 TO 8/1/2024, 9 a.m. to 3 p.m., Monday through Thursday.
US-26

West

Road Construction - No to Minimum Delay

SUNSET
US26, 1 mile East of Cornelius Pass Exit
Nighttime single lane closures in both directions between Cornelius Pass Road and Glencoe Road.
US-26

Road Construction - Estimated delay under 20 minutes

SUNSET
US26, 3 miles East of Manning
Road construction is occurring. Prepare to slow. Watch for workers.
US-26

Road Construction - Estimated delay under 20 minutes

WARM SPRINGS
US26, Intersection with Wapanita Highway ORE216
Road construction is occurring. Prepare to slow. Watch for workers.
Motorists should anticipate single lane closures controlled by flaggers on US26 & OR216, Sunday night through Friday morning, between 7pm and 7am while crews are onsite conducting mainline paving operations. Motorists should use caution while traveling through the work zone.
US-26

Road Construction - Estimated delay under 20 minutes

WARM SPRINGS
US26, 5 miles North of Madras
Road construction is occurring. Prepare to slow. Watch for workers.
<!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21655)
US-26

East

Road Construction - No to Minimum Delay

OCHOCO
ORE126, Prineville
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Crews will have daytime shoulder closures and lane shifts on US26 Monday-Friday. Claypool St will have closure for drainage installation. Access from US26 to Deer will be closed for intersection works with detours. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20268)
US-26

Road Construction - No to Minimum Delay

SUNSET
US26, 1 mile West of Necanicum
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
<!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21224)

Road Construction - Estimated delay under 20 minutes

HISTORIC COLUMBIA RIVER
HWY100, 5 miles West of Ainsworth State Park
Lane closures with flaggers directing traffic 5-9 a.m. weekdays.
Project description: Two 100 year-old elevated roadways that provide access to Multnomah Falls require repairs to continue providing access to one of Oregon's most iconic sites. The elevated roadways – called viaducts – carry vehicles and bicycles to the Falls and Lodge from the Historic Columbia River Highway. The west viaduct will be closed fall 2024 through spring 2025. The east viaduct will be closed fall 2025 through spring 2026. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)

Road Construction - No to Minimum Delay

HISTORIC COLUMBIA RIVER
HWY100, Troutdale
Periodic shoulder closures.
<!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
US-26

Road Construction - Informational Only

MT. HOOD
US26, Portland
Lane closures, traffic shifts, shoulder closures and up to 20-minute traffic holds weekdays.
US-26

Road Construction - Estimated delay under 20 minutes

MT. HOOD
US26, 3 miles West of Welches
No traffic impacts.
<!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21599)
US-26

Road Construction - No to Minimum Delay

JOHN DAY
US26, Prairie City
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
US-26

Road Construction - No to Minimum Delay

JOHN DAY
US26, John Day
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
US-26

Road Construction - No to Minimum Delay

JOHN DAY
US26, Dayville
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
US-26

Road Construction - No to Minimum Delay

JOHN DAY
US26, Mount Vernon
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
US-26

Bridge Work - No to Minimum Delay

SUNSET
US26, 2 miles West of Manning
Bridge work is occurring causing minimal delay to traffic. Use caution.
The project includes replacing the existing culvert with a single span concrete deck bridge. During construction expect noise and short delays. We will maintain two lanes of traffic during construction. Potential single lane closures with flaggers helping direct traffic. We estimate completing the project Summer of 2024. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20092)

Bridge Work - Estimated delay under 20 minutes

MCMINNVILLE SPUR
Bridge work is occurring. Prepare to slow.
Bridge work is occurring. Prepare to slow. Bridge work continues. Use caution. Expect traffic delays of up to 20 minutes several through early 2024. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19389)

US-26 Major Junctions (11)

View incidents along related routes

No active ODOT Message Signs found.