Highway US-20 Traffic & Road Conditions in Oregon

Oregon DOT Traffic Cameras

TripCheck Oregon Incidents (9)

US-20

Rock fall - No to Minimum Delay

CENTRAL OREGON
US20, 10 miles East of Juntura
A rock fall has occurred causing minimal delay to traffic. Use caution.

Road Construction - Estimated delay under 20 minutes

HISTORIC COLUMBIA RIVER
HWY100, 5 miles West of Ainsworth State Park
No traffic impacts.
Project description: Two 100 year-old elevated roadways that provide access to Multnomah Falls require repairs to continue providing access to one of Oregon's most iconic sites. The elevated roadways – called viaducts – carry vehicles and bicycles to the Falls and Lodge from the Historic Columbia River Highway. The west viaduct will be closed fall 2024 through spring 2025. The east viaduct will be closed fall 2025 through spring 2026. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
US-20

Road Construction - No to Minimum Delay

CENTRAL OREGON
US20, Sage Hen Rest Area
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
US-20

Road Construction - No to Minimum Delay

MCKENZIE
ORE126, Sisters
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Crews will be performing daytime shoulder closures on US20 Monday to Friday. Occasional nighttime lane closures on US20 from 8pm to 7am for striping. North Locust will be closed starting 3/5 with detours in place until end of May. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22072)
US-20

Road Construction - No to Minimum Delay

MCKENZIE-BEND
US20, 1 mile North of Bend
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
US-20

Road Construction - No to Minimum Delay

ALBANY-CORVALLIS
US20, 2 miles East of Corvallis
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
<!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21191)
US-20

West

Road Construction - Estimated delay under 20 minutes

CORVALLIS-NEWPORT
US20, Intersection with Alsea Highway ORE34
Road construction is occurring. Prepare to slow. Watch for workers.
Working complete elements of the ongoing Philomath Downtown Safety and Streetscape Project to improve livability and accessibility of the City's downtown area. Resurface the roadway to create a smoother driving surface. Expect minor delays. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21514)

Bridge Work - No to Minimum Delay

MCMINNVILLE SPUR
Bridge work is occurring causing minimal delay to traffic. Use caution.
Bridge work continues. Use caution. Expect traffic delays of up to 20 minutes several through early 2024. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19389)
US-20

Disabled Vehicle - Hazard - Estimated delay under 20 minutes

SANTIAM
US20, 4 miles West of Tombstone SnoPark Area
A disabled vehicle is creating a hazard. Prepare to slow or move over for worker safety.

US-20 Major Junctions (10)

View incidents along related routes

No active ODOT Message Signs found.