Traffic Related Events

No events of this type reported by DOTD.

Accidents & Incident Alerts

No events of this type reported by DOTD.

Road Closures

No events of this type reported by DOTD.

Roadwork

Road Maintenance Operations  Active

All Lanes Intermittent
Road Maintenance Operations on LA-3276 Both Directions from I-49 Southbound to Highway 171. All Lanes Intermittently Closed. Width Restriction: 10ft Starting 4/4/2023 7:00 AM
Date Posted: 4/3/2023 3:15:38 PM DOTD announces project to repair LA 3276 (Stonewall-Frierson Road) in DeSoto Parish A heavily traveled connector route in Stonewall, DeSoto Parish will soon undergo major improvements in the form of a $14.3 million repair project. Construction on LA 3276 (Stonewall-Frierson Road) is set to officially begin on Tuesday, April 4, 2023. LA 3276 connects US 171 and I-49, and services an average of over 9,000 vehicles per day. The contractor, Earnest Contracting, LLC, has already completed the full-depth patching portion of the project. Full-depth patching is a long-lasting method used to repair the base layers on certain sections of roadway and strengthen the existing pavement. This project will also be utilizing a technology called Geocell, which is used in construction to provide structural reinforcement for load support in the base of the roadway, a critical component of this particular project. Geocells are expandable panels made of high-density polymer material that when expanded, create a three-dimensional grid structure that can be filled with material and compacted. The Geocell grid for this project will be installed and then filled with stone, followed by two inches of stone on top of the grid, and then 6 inches of asphalt will be applied, creating a smooth driving surface and strong base underneath. All of the connecting driveways along this 4.6 mile stretch of LA 3276 will be adjusted for the increased height of the road due to the use of the Geocell technology, and then tied back into the highway. The project also includes drainage work, curb and gutter, and permanent signage and striping installation. During construction, lane width restrictions of no wider than 10 feet will be in place. The entire project is anticipated to be complete in early 2025, with progress dependent on weather conditions and other factors that may impact construction timelines.
Start Date: Apr 4, 7:00AM
View on Google Maps
ID: ERS--49405

Construction Work  Active

All Lanes Intermittent
Construction Work on LA-3276 Both Directions from US-171 Northbound to Timberline Cir . All Lanes Intermittently Closed. Starting 2/13/2023 5:32 AM
The Louisiana Department of Transportation and Development announces that preliminary work has begun on LA 3276 in Desoto Parish and there will be intermittent lane closures in place. Alternate Route: N/A Permits/Restrictions: N/A This work will be performed WEATHER PERMITTING. Safety Reminder: DOTD appreciates your patience and reminds you to please drive with caution through the construction site and be on the lookout for work crews and their equipment. Additional information: Call 511, visit www.511la.org, or download the Louisiana 511 mobile app for additional information. Out-of-state travelers may call I-888-ROAD-511 (1-888-762-3511). Motorists may also monitor the LA DOTD website at www.dotd.la.gov, by selecting MyDOTD, or by visiting the DOTD Facebook and Twitter pages.
Start Date: Feb 13, 5:32AM
View on Google Maps
ID: ERS--47984