Utilitywork  Active

All Lanes Intermittent
Utility Work on LA-120 Both Directions from Natchitoches Sabine Parish Line to LA-6. All Lanes Intermittently Closed. Starting 4/17/2023 6:00 AM
Date Posted: 4/11/2023 3:14:06 PM 4/11/2023 LA 120: Sabine Parish Line to LA 6 in Robeline Natchitoches Parish S.P. H.001145.6 Control Section 042-05 The Louisiana Department of Transportation and Development, (DOTD), advises the public that, weather permitting, on Monday, April 17th, 2023 construction will begin on LA 120 in Natchitoches Parish. This work will begin at the Sabine Parish line and proceed southeast along LA 120 to its intersection with LA 6 in Robeline. The intent of this project is to replace existing drainage structures, cut an in-place cement treated subgrade and base course, apply lime treatment to the subgrade, and then place 6 inches of superpave asphaltic concrete, followed by permanent striping on the roadway and other related work. The contractor will be required to maintain thru traffic at all times, but periodic lane closures and delays can be expected. The public is advised to remain alert to construction signs and changing roadway conditions. The project was awarded to the low bidder, Madden Contracting Co., LLC, in the amount of $10,781,403.79. The work associated with this project should take approximately 190 working days to complete. Permit/Detour Section Thru traffic will be maintained at all times with oversize and emergency vehicles allowed passage. There will be no detour routes for this project.
Start Date: Apr 17, 6:00AM
View on Google Maps