Traffic incidents and road conditions on I-90 in Washington

Real-time Traffic Cameras

View Traffic Cameras

Road Alerts

Construction

The westbound I-90 HOV lane will close between I-405 and 142nd Place Southeast for up to two years starting at 9 p.m. Monday, Feb. 26. The long-term closure of the 142nd Place Southeast HOV on-ramp to westbound I-90 begins at the same time. Signed detours will be available.

View on Google Maps
ID: 583671

Construction

Eastbound milepost 36 to 39 near North Bend. Until Friday, May 24 traffic will be reduced to two lanes for bridge deck rehab work.

View on Google Maps
ID: 594416

Maintenance

Starting Monday, Jan. 22 on westbound Interstate 90 near 436th Avenue Southeast (milepost 32) and State Route 202 (milepost 31), the right lane will close for maintenance until further notice.

View on Google Maps
ID: 580656

Construction

Sound Transit contractor crews will close the eastbound I-90 HOV lane between Judkins Park Station and the Mount Baker Tunnel from 8 p.m. to 5 a.m. nightly, Monday, May 20 through the morning of Friday, May 24.

View on Google Maps
ID: 596902

Maintenance

Starting Sunday, March 17 on eastbound I-90 from East Mercer Way to Bellevue Way Southeast, a temporary lane-shift is in-place with a reduced speed limit to 45 mph due to a failing expansion joint until further notice.

View on Google Maps
ID: 580194

Construction

Eastbound milepost 136 to 138 over the Vantage Bridge. Monday, May 20 at 5 a.m. until Thursday, May 23 at 8 p.m. there will be a 24-hour single-lane closure with a speed reduction and 10-ft width restriction for bridge work.

View on Google Maps
ID: 597133

Construction

Eastbound milepost 47 to 48 near Snoqualmie Pass. Until Friday, May 24 traffic will be reduced to two lanes for bridge deck rehab work.

View on Google Maps
ID: 596592

Lane Closure

Mobile Lane Closure for drain cleaning, on I-90 eastbound at milepost 288 from Argonne Rd to milepost 294 Barker Road, Spokane Valley, beginning at 9:49 am on May 21, 2024 until about 2:00 PM. Expect delays.

View on Google Maps
ID: 597439

Construction

Westbound milepost 138 to 137 over the Vantage Bridge. Monday, May 20 at 5 a.m. until Thursday, May 23 at 8 p.m. there will be a 24-hour single-lane closure with a speed reduction and 10-ft width restriction for bridge work.

View on Google Maps
ID: 597135

Construction

Westbound milepost 84 to 83 near Cle Elum: Until further notice, there will be westbound lane revisions over a temporary bridge for construction activity.

View on Google Maps
ID: 591343

Construction

Eastbound milepost 55 to 57 near Snoqualmie Pass. Monday, May 20 at 7 a.m. until Thursday, May 23 at 5:30 p.m. there will be a 24-hour single-lane closure for road work.

View on Google Maps
ID: 597129

Special Event

Friday, May 24 - A Billy Joel concert at the T-Mobile Park in Seattle will create additional congestion on Interstate 5 and 90, and State Route 99, 509, 513, 520 and 522 from 6:30 p.m. to 11:55 p.m.

View on Google Maps
ID: 597393

Rest Area

Facilities at the eastbound Ryegrass Safety Rest Areas on I-90 at milepost 125 (fifteen miles east of Ellensburg) are temporarily closed due to a water leak. Portable latrines are available.

View on Google Maps
ID: 596009

Exit Closure

Exit Closure on I-90 westbound at milepost 284, Thor-Freya Exit 283B. This exit is closed from the 25th of March until approximately June 3, 2024. Use other exits, expect delays.

View on Google Maps
ID: 588564
On I-90 westbound to 142nd Pl SE (MP 11) there is a collision blocking the ramp. Fire Assistance and Bellevue Police have arrived on the scene.

View on Google Maps
ID: 597401

Construction

The right lane and shoulder along the westbound I-90 off-ramp to SR 18 from 9 p.m. to 4:30 a.m. nightly Monday's through Thursdays beginning Thursday, May 23. No closures will occur over the Memorial Day holiday weekend.

View on Google Maps
ID: 597270

Construction

Westbound milepost 40 near North Bend. Until further notice there will be a 24-hour single-lane closure for slope stabilization work.

View on Google Maps
ID: 595597

Maintenance

I-90 exit 174 (Hansen Rd. near Moses Lake), Monday through Thursday from 7 a.m. to 3:30 p.m., there is single lane, alternating traffic with auto-flagger at the ramp where a crew is widening and realigning the roadway radius.

View on Google Maps
ID: 596644

Construction

Both directions milepost 64 to 70 near Easton. Monday night, May 20-21 through Friday night, May 24-25 from 7 p.m. to 7 a.m. nightly, there will be single-lane closures and a 10-ft width restriction for road work.

View on Google Maps
ID: 597130

Construction

Both directions milepost 71 to 111 between Easton and Ellensburg. Monday night, May 20-21 through Wednesday night, May 22-23, from 8 p.m. until 8 a.m. nightly, there will be multiple short single-lane closures for road work.

View on Google Maps
ID: 597131

Flammable Cargo Restriction

Flammable cargo is prohibited on I-90 eastbound & westbound from Rainier Ave S (MP 3) to Island Crest Way (MP 7).

View on Google Maps
ID: 591201

Maintenance

Eastbound milepost 106 to 115 near Ellensburg. Monday, May 20 through Thursday, May 23, from 6 a.m. to 4:30 p.m. daily there will be single-lane closures for road work.

View on Google Maps
ID: 597132

Construction

The left lane and shoulder of westbound I-90 will close west of the SR 18 interchange from 9 a.m. to 5 p.m. daily Monday, May 13, to Wednesday, May 15, and at the same times Monday, May 20, to Thursday, May 23, and Tuesday, May 29, to Wednesday, May 30, for conduit and fiber work.

View on Google Maps
ID: 596260

Construction

On I-90 eastbound just west of SR 18 (MP 23) eastbound to MP 26 the left lane is closed due to roadwork.

View on Google Maps
ID: 597376

I-90 Major Junctions (9)

View incidents along related routes
NOT intended for emergency use. For emergencies visit WADOT for more information.